Flat, dry and clean — the foundation of every install.
A new floor is only as good as the subfloor beneath it. Start by checking for flatness with a long level or straightedge; dips and humps telegraph through thin flooring like LVP and cause squeaks, flex, or failed seams.
The subfloor must be dry. Test concrete for moisture before gluing down flooring, and never install over a wet slab. Clean the surface of old adhesive, dust, and debris so your bonding material or underlayment can do its job.
Fill low spots with a patching or self-leveling compound, and grind down high spots. For wood subfloors, screw down any loose panels and address squeaks before the new floor goes on top.
Key takeaways
- Check flatness with a straightedge and fix dips and humps before installing.
- Confirm the subfloor is dry — test concrete for moisture before gluing down.
- Clean, patch, and secure loose panels so the finished floor performs.
JR Works LLC Resource Center
Practical guidance from your East Texas flooring & remodeling team.
